Warm living room with decorative wood walls, a wood ceiling and flooring, a cream sofa and a leather armchair.

Walls. Ceilings.
Floors.

Decorative materials for importers,
distributors and project buyers.Three collections. One manufacturer.

Explore Our Collections
SZ STRONG BUILD

Good design starts beneath the surface.

Our collections

Made for every surface.

WPC Fluted Panels material detailPale oak fluted wall panels in a contemporary living room
01 / WALL PANELS

WPC Fluted Panels

WPC profiles with PVC, PET and other decorative film finishes.

Material & installation
Core
Wood-plastic composite (WPC)
Rib width
20 mm
Surface
PVC, PET and other film options
Explore this collection
Aluminium Honeycomb Panels material detailWarm white aluminium honeycomb ceiling panels with integrated linear lighting
02 / CEILING SYSTEMS

Aluminium Honeycomb Panels

Aluminium panels in 7 or 9 mm, installed with matching accessories.

Material & installation
Material
Aluminium honeycomb
Thickness
7 mm / 9 mm
Installation
Requires matching installation accessories
Explore this collection
Self-Adhesive Floor Planks material detailLight wood-look self-adhesive floor planks in a sunlit contemporary living room
03 / FLOORING

Self-Adhesive Floor Planks

Stone-plastic flooring with calcium carbonate and an adhesive backing.

Material & installation
Material
Stone-plastic with calcium carbonate
Installation
Peel-and-stick adhesive backing
Before fitting
Confirm the base surface and preparation requirements
Explore this collection

From sample to shipment.

Our Key Markets

AfricaAsiaSouth AmericaEuropeOceaniaNorth AmericaSeven seas (open ocean)Middle EastAfricaSouth AmericaCanadaCentral Asia
Five markets. A world of possibilities.
Boutique hotel reception featuring warm ivory marble-look UV wall panels

Choose your wall finish

Consider the surface, profile and film together when planning a wall finish for your space.

Read article
Oak fluted wall panel meeting an ivory doorway and clean skirting detail

Plan panel junctions

Resolve doorways, corners and ceiling edges with details matched to your selected panel system.

Read article
Project floor plan and organized procurement schedule on a natural oak desk

Self-adhesive floor basics

Understand stone-plastic flooring, its adhesive backing and the site details to confirm before installation.

Read article
Browse all articles